PALUA PIER – PUMP HOUSE

PALUA PIER – PUMP HOUSE

November 2012
 

This project involves the development of engineering facilities of the Pump House which is in charge of the storaging of the pumping equipment and water storage tank for the supply and distribution of fresh water system Dock CVG Ferrominera Orinoco CA Palúa Pier, is located in the Parish Simon Bolivar, San Felix, Bolivar State. It has a construction area of two hundred and nine with twenty square meters (209.2 m). The storage tank of fresh water is designed with reinforced concrete structural walls and ceiling of solid slab, pump room has open access by the side walls according to the requirements expressed by the client and the existing regulations.

 
 
previous arrow
next arrow
Shadow
Slider